Project Background
The customer required a reliable replacement or new-build hydraulic solution while maintaining the existing equipment interfaces and operating sequence.Key Challenges
Critical challenges included limited installation space, demanding duty cycles, environmental exposure and documentation requirements.
Yongjian's Solution
The engineering team reviewed operating data, prepared interface drawings and configured materials, seals, controls and test procedures for the application.Technical Configuration
The final configuration combined application-specific hydraulic components, structural interfaces and monitoring requirements.Manufacturing & Testing
Manufacturing followed controlled machining, welding, assembly, pressure testing and documented inspection stages.Delivery / Commissioning
The equipment was preserved, packed and delivered with drawings, records and installation guidance.Project Results
The delivered system met the agreed functional and interface requirements and provided a documented basis for future maintenance.Technical Configuration
Project Year2024
LocationEurope
ScopeEngineering, manufacturing, testing and delivery